Maasvlakte Kademuur

Client

WTB

Location

Maasvlakte

Proceedings

Combination OTR Civil (TBI Infra (Mobilis), Dimco and Dredging International)

Period

2016

On behalf of Havenbedrijf Rotterdam, the Combination OTR Civil (TBI Infra (Mobilis), Dimco and Dredging International) realizes the quality of life for the project Offshore Terminal Rotterdam. The quay will be used to load foundations poles (e.g. steel tubes with lengths up to 100 meters and a diameter of 10 meters 12 meters) that are used to fund the wind farms in the North Sea. The foundation poles are loaded by so-called jack-up ships that put their feet on the harbor floor and push themselves up. The quay has a rotating height of 30 meters.

At the end of 2016, the first part of the quay is ready for use. The entire quay is ready by mid-2017.