Reconstructie Rode Beek

Client

Combinatie de Koempel VOF (Dura Vermeer- Ploegam)

Location

Brunssum

Proceedings

Processing and placing of reinforcement 220 tonnes

Period

2014 – 2016

The partial excavation of the minesteenberg creates space to make the stream meander again in a wider zone and to increase water quality. The ecological and recreational barrier between the nature reserves Brunssumerheide, Schutterspark, Schinveldse bossen and Teverenerheide is lifted.

The work is carried out by Combination De Koempel, a collaboration between Ploegam and Dura Vermeer.

  • The work to be carried out shall consist essentially of:

  • Digging, transport and processing of 450000 m3 mining stone

  • Construction of transport sewers, sewers and salvage facilities

  • Ganzepool Road Bridge Construction work

  • Restoring and decorating Terca terrain

  • Unlocking the Red Beek

  • Recreational paths